MLCC buying conditions can change even when a supplier has not issued a price notice covering your part. In a July 28, 2026 survey, TrendForce reported that June shipments from Murata, Samsung Electro-Mechanics and Taiyo Yuden reached a five-year monthly high, while suppliers shifted capacity toward higher-end X6S and X7R products. Those findings describe a production mix, not a new price for a particular purchase order.

Which MLCCs need a closer look #

A BOM line is defined by more than capacitance. Package size, dielectric, voltage rating, tolerance, termination, temperature behavior and qualification grade all affect whether another part can be used. Capacity moving toward one specification may leave a different specification with a different delivery pattern.

For each critical MLCC, confirm the complete manufacturer number and the exact quantity needed. Ask whether a quote reflects held stock, a factory allocation or an estimated build. Keep the quote date, validity and delivery location with the price. An order already accepted by a supplier may follow different terms from a new order, so check both separately.

How to respond #

If a supplier proposes a replacement, compare electrical characteristics and DC-bias behavior as well as the package and land pattern. Engineering should approve the change before the line is released. If the approved part remains available, a written delivery commitment is more useful than applying a market-wide percentage to the BOM.

TrendForce's survey is a reason to check specific high-capacitance parts early. It is not evidence that every Samsung Electro-Mechanics or Taiyo Yuden MLCC has increased by one rate.

Key reference #

Pricing, lead time and available lots can change. Confirm current stock, lot details, packaging and final price before ordering.