The part number, quantity and price can all look right while the stock condition says only “original stock.” That is not enough to place a purchase order. The buyer still needs to know which lot is being offered, whether its packaging has been opened, and whether the date code and quantity match the goods that will ship.
Make the quote identify one actual lot
Put the complete ordering code, quantity, date code, lot number, packaging format and delivery destination on the same quote. A factory-sealed reel, an opened tray and loose parts from a split reel should not share one vague “original packaging” label. If the quantity combines date codes, list each lot separately. For moisture-sensitive devices, ask whether the moisture-barrier bag has been opened and what handling is required.
Request photos of the lot proposed for shipment: outer box, inner pack and labels. The part number, lot number and quantity in those photos should agree with the quote. If the supplier changes the lot, photos of the earlier lot no longer establish the condition of the new one.
What photos can and cannot establish
| Evidence | What to compare |
|---|---|
| Outer and inner packaging | Manufacturer labels, seals, reel or tray labels, and the reason for any opened or split pack. |
| Device body | Marking, surface and package edges across the lot. Unusual scratches or coating differences call for a closer look. |
| Leads or solder balls | Bent leads, oxidation, solder or flux residue. A top-view photo alone may miss these details. |
| Lot documents | Whether available invoices, shipment records or certificates can be linked to the quoted lot. |
One visual difference does not prove a part is counterfeit; normal variation exists across factories and lots. Photos are useful for catching an obvious part-number or packaging mismatch. For a high-value lot, an unclear chain of custody or conflicting evidence, pause the order and decide whether magnified inspection, electrical testing or an independent inspection is needed.
Agree on acceptance before the order
State the acceptable date codes, whether factory sealing is required, whether split packs are allowed, which records are needed, and how mixed lots or damaged packaging will be handled. If the approved BOM permits only one suffix, keep a proposed alternative on a separate quote line for engineering review.
Ask for label and packaging photos of the proposed lot, then compare them with the agreed acceptance criteria and inspection results. “Original stock” is an offer description, not an acceptance decision.
