One supplier quotes a part at $1 each but will sell only a 3,000-piece reel. Another quotes $1.20 each and will ship the 500 pieces you need. The lower unit price does not settle the purchase. To compare the offers, put the exact part number, quantity you must buy, packaging, date code and committed delivery date next to the price.
Why a 500-piece need can become a 3,000-piece order #
MOQ is the minimum quantity a supplier will accept on an order. SPQ is the number of pieces in a standard factory pack, such as a reel, tray or tube. They are different figures. If a factory reel holds 3,000 pieces, a supplier may still offer 500 on cut tape. Another supplier may sell only the full reel.
Take a simple example. You need 500 pieces. Supplier A charges $1.20 per piece plus a $50 cut-tape fee, for a $650 purchase. Supplier B charges $1 per piece but requires the full 3,000-piece reel, for a $3,000 purchase. B's lower unit price may make sense if future orders will use the extra stock and you can store it properly. For an immediate 500-piece requirement, it is a much larger commitment.
Breaking a reel or tray also changes the receiving conditions. If the assembly line needs an unopened factory reel, ask whether that is what the quote covers. For moisture-sensitive parts, check the dry-pack condition, exposure history and remaining floor life. The word “reel” alone does not answer those questions.
Stock on hand still needs a delivery date and a lot #
A stock offer should state the quantity available to ship, where the goods are, and when they can leave. A future-delivery offer should state the expected lead time and whether its price will hold until shipment. Identical unit prices do not make those offers equivalent.
Ask for the actual date code and lot quantity. A date code identifies the manufacturing year and week; it does not, by itself, prove whether a part is acceptable. Your customer's requirements, storage records and assembly process determine the acceptable range. If a quote says only “recent date code,” request the specific code and packaging label before placing the order. Automotive, medical and approved-BOM projects may need additional lot documents under their own requirements; there is no universal age limit to apply to every part.
Freight, tax, cut-tape charges and any other fees belong in the comparison. If a quote includes an “allocation surcharge,” ask what it covers, how much it adds and when the offer expires. It is a commercial term, not a standard charge that every constrained part carries.
Make the RFQ specific enough to compare the replies #
A useful request identifies the manufacturer and full ordering code, required quantity, acceptable date-code range, packaging requirement, destination and requested ship date. State whether another manufacturer or package suffix is allowed. If lot or traceability documents are required, ask the supplier to confirm them in the quote.
Then compare the total amount payable, quantity and delivery date, lot and packaging conditions side by side. Follow up on unanswered fields before ordering. A missing ship date or unclear pack condition can matter more to the production schedule than a few cents on the unit price.